10 Tips for Your Journey to the Public Cloud Suchi Upadhyayula Sean McCluskey Director of Product Development, Intuit Director of Quality and Operations, Intuit May 28, 2015

Slide 1

Quick Facts About Mint

Slide 2

Millions of Active Users

Slide 3

> 50TB of Financial Data

Slide 4

> 400 Servers (in 10 PODS, > 90 MySQL Shards)

Slide 5

1.5k req/sec, 80k concurrent connections, 120k concurrent sessions

Slide 6

Tablets iPad, Android, Surface Smart Phones iPhone, Android, Win 8 Web Desktops Mac, Win 8 Mint is on …

Slide 7

10 Tips from Our Journey

Slide 8

Load Balancing Security policy against terminating SSL on ELB ELB acts as a dumb pass-through Routing logic to support bulk-head pattern (Pods) too complex for current ELBs Developed a proxy layer to: Terminate SSL Implement routing logic Access audit logging 1

Slide 9

Securing Sensitive Customer Data Multi-layer encryption (integrated with Amazon’s Key Management System) with periodic key rotation: Application encryption of sensitive data Encryption in flight File level encryption at rest Reviewed fields to identify sensitive data to be “application level” encrypted Dropping of clear text columns before data ready to ship >50TB of data encrypted 2

Slide 10

Establishing a Framework for Low Latency Prepare for latency impact due to encryption Mint planned for 30% degradation Continuous measurement of TP50, TP90, TP99 for critical features Weekly review of TPs to drive improvements to reduce latency Constant tuning of code and single page architecture Able to maintain TP50 & TP90 SLAs Create a culture of continuous focus on TPs to drive improvements 3

Slide 11

Infrastructure as Code Configuration change in the infrastructure resulted in a release failing to deploy and requiring rollback What we learned: In AWS, operations spends a lot of time writing code: CloudFormation templates, deployment automation, monitors Development rigor was new to the operations team Needed to adopt development practices within operations: designs, code reviews, testing, validation, formal release processes for infrastructure 4

Slide 12

Migrating Large Volumes of Data Not feasible to copy >50TB (and growing) of secure data “over the wire” Plan for data transport to AWS: Encrypted drives physically secure shipped to AWS; 3 days to ship backup copy to AWS and upload Catch up replication Final drive shipment needs to be timed so that replication can catch up to the shipment window and sustain data growth prior to production cutover 5

Slide 13

High Availability and Disaster Recovery Recovery Time Objective (RTO): time to restore a service to operation Recovery Point Objective (RPO): amount of data acceptable to lose Solve for availability first with Multi-AZ Determine acceptable RTO/RPO and solve for regional failures second Balance lower RTO/RPO against increased cost and complexity Recognize the technology you use to handle regional failures will add complexity that could increase outages Region US-EAST Availability Zone Availability Zone Availability Zone Region US-WEST Availability Zone Availability Zone Availability Zone 6

Slide 14

Monitoring and Diagnostics Disassociate with IPs Instances, ELBs, and their IP addresses are dynamic Number of instances are constantly changing When an instance has issues it can be “blown away” Build resilient and self-healing infrastructure Monitoring should then be built to compliment this If you alert on failure, have the courtesy to alert on healing 7

Slide 15

End-to-End Testing In addition to validating the full functionality of the production environment, you also need to validate: Build, config, deploy, and validation infrastructure Logging, Monitoring, etc system that ensure the environment is healthy Access controls and security Auto-Scaling Continuous synthetic testing in the production environment provide an end-to-end test to ensure the customer experience doesn’t degrade 8

Slide 16

Managing Costs Compute: reserved vs. on-demand If compute is “on” for more than 9 hours per day, reserved will save money On-demand for seasonal workloads and rare peaks Reaper scripts; shutdown unused instances Snapshots drove significant cost savings Storage is cheap A lot of work that yields a small return IOPS are not Optimizing IOPS per shard saved a lot of money 9

Slide 17

Release Operations Infrastructure deployed independently of applications DB schema AMI Infrastructure as code Application Support rollbacks for everything (blue-green) We can always go back to N-1, ALWAYS!! 10

Slide 18

Summary Load balancing: Evaluate if ELB is sufficient and plan ahead Security: Multi-layer encryption, AWS Key Management Low latency: TP50, TP90, TP99 measure and improve Infrastructure as code: Design, review, test templates Migrating large volumes of data: Encrypted drives HA/DR: Multi-AZ, multi-region Monitoring and diagnostics: Disassociate with IP addresses End-to-end testing: Don’t forget to test auto-scaling Managing costs: Compute is more expensive than storage Release operations: Rollback-ready, blue-green